New resources centre and rejuvenation of the ticket office at a unique Norfolk visitor attraction

Works involved the provision of a new education resources centre, ticket office and toilets.

Restoring a fire damaged school in a conservation area

When Parracombe Primary School suffered extensive fire damage NPS was on hand to provide expert advice.

A sensitive refurbishment for Elsecar Newcomen Engine

NPS was recently commissioned to provide quantity surveying and CDMC services for the refurbishment of one of the most important industrial heritage sites in the UK.

Relocating a Grade II listed Police Box

Overcoming challenges to relocate a historic police box without damaging the wooden structure.

Transforming building services to create a modern hospital environment

NPS designed the building engineering services for the refurbishment of an existing Victorian office block into a new private healthcare facility.

Finding permanent disabled access solutions

Working closely with English Heritage and conservation officials we found a permanent solution for disabled access at Hull’s Guild Hall.

Dealing with works completed on a sensitive site

NPS was instructed to provide a two-classroom extension. However, the site was possibly one of the most complicated NPS has had to deal with.

Thurrock Council - Office space utilisation study

An outline business case for the re-design of the civic centre was developed based on the council’s wider office strategy and corporate objectives.

Occupancy Audit and Workplace Strategy for Hounslow

NPS contributed to development of a business case for the replacement of the existing civic centre.

Our property strategy for London Borough of Croydon

Delivering a property strategy which was responsive to a changed operating environment.
Page
 2 
of 7